it looks around 85% likely that i will be hired again by the school to teach 6 electives. the new principal is making a big effort to get me hired as a full time teacher and retain me, which is my desire. i will again have 2 construction and design classes with a structural emphasis and then create 2 classes of C&D with an agricultural emphasis. (excited about this one, as we get to help architect the school farm) my other 2 electives will be PE and i will be doing a yoga/body maintenance class and a straight PE class with an emphasis on outdoor sports and recreation. as i am looking forward to this opportunity again, working with the kids of this community... the end of summer found me quicker than i had planned.
0 Comments
the last week, and all the little things, are always the hardest to get through in a project. but when it is all done it is very rewarding. 510 looks good, a little tweak here or there and its one of the best rentals in walsenburg. i appreciate all the help i got from jarrod this past week on the electric and keeping his head down to wrap this baby up.
the loft project is coming to a close with the most important thing to come.... electric:) ill have a final set of photos at the end of this week and anne will move in next weekend.
we are getting down to all the finishing touches, with a little painting left and another coat of poly on the front floor. the plumbing is basically done and we are focusing on the electric for the last 2 weeks. move in date Aug 1st:)
4 more weeks to wrap this mainstreet project up. my sister is in town this week to help and i am looking to get a lot of work done in the next two weeks. august looks like a tip to Oklahoma and Texas and a job or two. always looking for work...and will travel:)
|